Home > Knowledge > Content

Product Spotlight - Hydro-Testing

- Jan 11, 2019 -

At ZQV, all of our fabricated ball valves are carefully hydro-tested before being shipped. This unit is about to be filled with water and pumped up to the appropriate test pressure, which will be based on its order specifications. We can use these hydraulic clamps to help quickly and easily seal the unit for this test. After withstanding the pressure for a specific length of time, the unit is drained, and is now ready for finishing touches before we send it out the door.

Previous: No Information

Next: Pay attention to flush the pipe

Related Industry Knowledge

Related Products

  • 3PC Reduce Port Ball Valves 2000PSI
  • 3PC Threaded Ball Valve 3000 PSI
  • Cast Steel Bolted Bonnet Globe Valves
  • Dual-Plate Wafer Check Valve 300LB
  • Single Plate Wafer Check Valve
  • Socket Welded Check Valve